Essentra Components manufacture plastic parts for industrial uses and so the building needed to have three levels of storage racking, loading bays, mezzanine offices and fibre links to the main plant. In 2012 Ikon Construction approached us to design and build a 3,000 square metre high-bay warehouse in order to concentrate their distribution on one site, having just negotiated a turnkey contract with  Essentra Components.
We obtained planning consent and worked closely with the client and contractor to ensure that the warehouse was designed to suit the logistics requirements of the distribution team.